Peregrinus was hauled out and put on the hard this morning, via 88-ton crane, for regularly scheduled maintenance: antifouling paints, protective zincs, bow thruster, propeller, c-drive transmission. An existing thru-hull orifice will be resized in preparation for installation of ForwardScan.
It will be a week or so before the boat is back in the water.